UTM, Power Washing & Painting via Rope Access
- Andy Lin
- Sep 5, 2024
- 1 min read

In August, we were engaged by a well-established shipyard in Batam, Indonesia, to work on a flare tower project on an FPSO vessel. The scope of work involved Non-Destructive Testing (NDT), specifically Ultrasonic Thickness Measurement, power washing at 3000 psi, and applying eight layers of paint across an area of nearly 2000 square meters.
With the flare tower standing over 60 meters tall, we swiftly assembled a team of rope access technicians specialized in both painting and NDT. The project spanned almost two months, during which the client requested that the Indonesian flag be raised on the flare tower on August 17th to celebrate Indonesia’s Independence Day.
To learn more about our business, do not hesitate to contact us. We are here to assist you.
indocair menghadirkan suasana kompetitif yang menyenangkan di dunia gaming.
TERMINAL4D
LINK TERMINAL4D
LINK ALTERNATIF TERMINAL4D
LOGIN TERMINAL4D
DAFTAR TERMINAL4D
TERMINAL4D SLOT
TERMINAL4D TOGEL
TERMINAL4D
TERMINAL4D
TERMINAL4D
TERMINAL4D
TERMINAL4D
TERMINAL4D
TERMINAL4D
TERMINAL4D
TERMINAL4D
TERMINAL4D
TERMINAL4D
TERMINAL4D
TERMINAL4D
TERMINAL4D
TERMINAL4D
TERMINAL4D
TERMINAL4D
neototo
bandar togel online
slot rtp
neototo
bandar togel online
slot online
neototo
togel online
slot online
neototo
agen togel
slot online
neototo
slot toto
slot gacor
neototo
neototo
neototo
neototo
neototo
bacan4d